Replace over 100' of cast iron 4" pipe with PVC

The client was experiencing frequent backups in the line. RYN Services LLC conducted a camera inspection, revealing a severed and collapsed drain line. A previous repair had only replaced a broken section, connecting it with a hub band. To ensure a long-term solution, we proposed replacing the entire pipe run with new PVC. The replacement was successfully completed over three days.